New School Building: Edison Elementary School

Información en español

Local voters approved a bond measure in November 2018 to fund capital improvements at every 4J school and replace Edison Elementary School, Camas Ridge Elementary School, and North Eugene High School with high-quality facilities built for school safety, modern seismic standards, sustainability, and 21st-century education.

After two years of construction, the new Edison Elementary School, replacing the original school building constructed in 1926, opened to students and staff in September 2022. A grand opening celebration was held on Oct. 25, 2022.

Project Updates

Edison Elementary Project News (Click to expand)

 Grand Opening of Edison Elementary School (10.24.22)
Construction of New Edison in Full Swing (03.15.22)
Edison Construction Warming Up this Fall (11.22.21)
New Edison Building Steeled for Next Phase (07.26.21)
New Edison Building On the Horizon (12.05.20)
Edison Elementary Design Determined (10.08.20)
Virtual View: Soar Through Edison School Design (06.28.20)
Preliminary Work to Begin at Edison Site (06.25.20)
Fond Farewell to Edison Elementary School Building (06.10.20)
New Edison Elementary School Design Takes Shape (05.01.20)
School Board Update on Edison Design (04.22.20)
Contractor Chosen to Build New Edison (02.18.20)
Architects’ Update at Edison Design Open House (12.16.19)
Edison Design Open House (11.28.19)
Sneak Peek at Initial Edison Design Concepts (11.22.19)
School Board Update on Edison Design (11.20.19)
Willard Swing School Site & Floor Plan Update (11.05.19)
Construction at Willard Site Begins Soon (10.21.19)
Who Will Build the New Edison? (09.01.19)
Architect Teams Chosen to Design New Schools (08.29.19)
Edison Elementary School Design Direction (08.28.19)
Edison Design Direction: Overview Slides (08.28.19)
Let’s Talk: Preliminary Design Direction for New Edison Elementary School (07.31.19)
Weigh In on Design Direction for New Edison Elementary School (06.18.19)
Planning Begins for New Edison Elementary School (05.30.19)
How, Where & When: School Rebuilding Plan Update (05.02.19)
School Board Narrows Options for School Rebuilding Plan (04.05.19)
School Rebuilding Plan Community Meeting (03.22.19)

Design & Build

The Edison Elementary School design team, Mahlum Architects and Robertson Sherwood Architects, completed design of the new building in the spring of 2020.

The design process was initiated with a review of districtwide community-developed visioning and planning documents and a depth of other district reference materials, followed by a public outreach meeting to gather feedback and better understand the community’s priorities by inquiring about their places of memory, community use of the property, what the community cherishes, and what could be improved.

A number of common themes emerged including prioritizing exterior open space on the small 2-acre site, even though the school will grow in size. The team worked through several rounds of program and site test concepts to develop a final design concept that aligned with the visioning goals and adjacencies outlined in the educational specifications, and also addressed district and community goals including those associated with entry, gathering and community use. The design team developed further building and site details reflecting feedback and community comment.

Local company John Hyland Construction began building the new Edison building in fall 2020. Crews removed the old structure and the district salvaged bricks from the old building to give to the neighborhood. Key foundational pieces of the building were given shape during the winter and in spring and summer of 2021 the structural steel was carefully erected, allowing the new building to take shape. Exterior weatherproofed paneling and brick laying now can be easily observed from the street. The new building’s construction is ongoing and progressing rapidly.

When & Where: Timeline & Location

The new building for Edison Elementary School is being constructed first, among the three new school buildings funded by the bond measure, with site work kicking off construction in summer 2020 and the new school opening in fall 2022.

The Edison school property is very small, 2.6 acres, so the new building cannot be constructed with the school continuing to operate in the old building. Camas Ridge also cannot continue to operate in its old school building if the new school is to be built in the preferred location on the site. No other school building in the area has capacity to temporarily house the school programs, so a temporary school site is necessary.

During the 2019–20 school year a temporary school site was prepared at the Willard property (29th & Lincoln) to house first Edison Elementary School from 2020 to 2022 and then Camas Ridge Elementary School from 2022 to 2024, during construction of the new buildings at the existing school sites.

How: Design Direction 

Before beginning architectural design work for the new Edison building, the district sought community input on architectural style approaches and on the importance of partially preserving some original building elements or attempting to retain part of the original brick building façade among other values for school design.

Community input emphasized the importance of honoring nature and green space and fitting the neighborhood in scale and design. Northwest and traditional design approaches were well-received; fewer people preferred a more contemporary design approach for the new Edison. Most respondents preferred acknowledging the school’s history in some way but not retaining the original brick building façade.

The architects who designed the new Edison were asked to:

  • Design to fit the neighborhood in scale and green space
  • Consider traditional and northwestern design styles
  • Honor the building’s history through historic displays and potentially by repurposing some materials in an interpretive preservation approach, not by preserving any portions of the façade in place
  • Provide community updates during the design process

Timeline Overview

  • Spring 2018: Bond package plan includes new buildings for Edison and Camas Ridge Completed
  • Fall 2018: Bond measure approved by voters Completed
  • Spring 2019: Discussions with staff and parents about next steps Completed
  • Late Spring 2019: Determination of timeline and location for new Edison and Camas Ridge Completed
  • Summer 2019: Community conversation about Edison design direction Completed
  • Early Fall 2019: Determination of design direction for new building Completed
  • 2019–20: Planning and preparation for school moves Completed
  • 2019–20: Swing school construction at Willard Completed
  • Summer 2020: Edison moves to swing school site Completed
  • Summer 2020: Preliminary Site Work Completed
  • Fall 2020: Old building removal Completed
  • 2020-22: Construction of new building Completed
  • 2020–2022: Edison Elementary School at Willard Completed
  • Fall 2022: New Edison Elementary School building opens Completed

About the Project 

• Timeline: Construction began summer 2020, new school opened in September 2022
• Architect team:
 Mahlum Architects and Robertson Sherwood Architects
• General contractor: John Hyland Construction, Inc.
• Capacity: ~450 students
• Building history: Original building constructed in 1926

About the School Bond Measure

In November 2018, voters in Eugene School District 4J resoundingly passed a $319.3 million school bond measure to fund improvements at every 4J school, and replace three aging school buildings with high-quality facilities built for school safety, sustainability, modern seismic standards, and 21st century education. The improvements include new student technology, updated instructional materials, accessibility and equitability enhancements, security upgrades, and building repairs.

Right Now at the Site

 

OxBlue Construction Cameras

 

 

Image updated every 10 minutes

Learn More

Stay informed: Join the 4J bond email list


Nuevo edificio escolar: Escuela Primaria Edison

Los votantes locales aprobaron una medida de bonos en noviembre de 2018 para financiar mejoras de capital en cada escuela 4J y reemplazar la Escuela Primaria Edison, la Escuela Primaria Camas Ridge y la Preparatoria North Eugene con instalaciones de alta calidad construidas para la seguridad escolar, estándares sísmicos modernos, sustentabilidad y educación del siglo XXI.

El edificio original de la Primaria Edison fue construido en 1926 y estaba en malas condiciones.

La construcción del nuevo edificio para la Primaria Edison ya está en marcha. La nueva escuela abrirá en el otoño de 2022.

Actualizaciones

Noticias del proyecto de la Primaria Edison (haga clic para ampliar)

Diseño y construcción

El equipo de diseño de la escuela primaria Edison, Mahlum Architects y Robertson Sherwood Architects, completó el diseño del nuevo edificio en la primavera de 2020.

El proceso de diseño se inició con una revisión de los documentos de planificación y visión desarrollados por la comunidad en todo el distrito y una profundidad de otros materiales de referencia del distrito, seguido de una reunión de divulgación pública para recopilar comentarios y comprender mejor las prioridades de la comunidad al preguntar sobre sus lugares con recuerdos, uso comunitario de la propiedad, lo que la comunidad aprecia y lo que podría mejorarse.

Surgieron una serie de temas comunes, incluida la priorización de espacios abiertos exteriores en el sitio pequeño de 2 acres, a pesar de que la escuela crecerá en tamaño. El equipo trabajó en varias rondas de conceptos de prueba del programa y del sitio para desarrollar un concepto de diseño final que se alineara con las metas de visión y las adyacencias descritas en las especificaciones educativas, y también abordase las metas del distrito y la comunidad, incluidas las asociadas con la entrada, la reunión y el uso comunitario. El equipo de diseño desarrolló más detalles del edificio y del sitio que reflejan la retroalimentación y los comentarios de la comunidad.

La empresa local John Hyland Construction comenzó a construir el nuevo edificio Edison en el otoño de 2020. Las cuadrillas retiraron la estructura anterior y el distrito recuperó los ladrillos del edificio anterior para dárselos al vecindario. Durante el invierno se le dio forma a las piezas fundamentales clave del edificio y en la primavera y el verano de 2021 se erigió cuidadosamente el acero estructural, lo que permitió que el nuevo edificio tomara forma. Los paneles exteriores impermeabilizados y la colocación de ladrillos ahora se pueden observar fácilmente desde la calle. La construcción del nuevo edificio está en curso y avanza rápidamente.

Cuándo y dónde: cronograma y ubicación

El nuevo edificio de la Escuela Primaria Edison se está construyendo primero, entre los tres nuevos edificios escolares financiados por la medida de bonos, con el inicio de la construcción del trabajo en el sitio en el verano de 2020 y la apertura de la nueva escuela en el otoño de 2022.

La propiedad de la escuela Edison es muy pequeña: 2.6 acres, por lo que el nuevo edificio no se puede construir si la escuela sigue funcionando en el edificio antiguo. Camas Ridge tampoco puede continuar operando en su antiguo edificio escolar si la nueva escuela se va a construir en la ubicación preferida de su sitio. Ningún otro edificio escolar en el área tiene capacidad para albergar temporalmente estos programas escolares, por lo que es necesario un sitio escolar temporal.

Durante el año escolar 2019–20, se preparó un sitio escolar temporal en la propiedad de Willard (29th & Lincoln) para albergar primero a la Escuela Primaria Edison de 2020 a 2022 y luego a la Escuela Primaria Camas Ridge de 2022 a 2024, durante la construcción de los nuevos edificios en los planteles escolares existentes.

Cómo: Dirección del diseño 

Antes de comenzar el trabajo de diseño arquitectónico para el nuevo edificio Edison, el distrito buscó la opinión de la comunidad sobre los enfoques de estilo arquitectónico y sobre la importancia de preservar parcialmente algunos elementos originales del edificio o intentar conservar parte de la fachada original del edificio de ladrillo, entre otros valores para diseño de la escuela

Los aportes de la comunidad enfatizaron la importancia de honrar la naturaleza y los espacios verdes y adaptarse al vecindario en escala y diseño. Los enfoques de diseño tradicional y del noroeste fueron bien recibidos; menos personas prefirieron un enfoque de diseño más contemporáneo para la nueva Edison. La mayoría de los encuestados prefirieron reconocer la historia de la escuela de alguna manera pero no conservar la fachada original del edificio de ladrillos.

A los arquitectos que diseñaron la nueva Edison se les pidió:

  • Adaptarse al vecindario en escala y espacios verdes
  • Considerar los estilos de diseño tradicionales y del noroeste
  • Diseñar partes de la fachada en su lugar
  • Brindar actualizaciones a la comunidad durante el proceso de diseño

Cronograma

  • Primavera 2018: El plan del paquete de bonos incluye nuevos edificios para Edison y Camas Ridge Completado
  • Otoño 2018: Medida de bonos aprobada por los votantes Completada
  • Primavera 2019: Conversaciones con el personal y los padres sobre los próximos pasos Completadas
  • Primavera 2019: Determinación de los cronogramas y ubicaciones para las nuevas Edison y Camas Ridge Completadas
  • Verano 2019: Conversación comunitaria sobre la dirección del diseño de Edison
  • Completada
  • principios del otoño de 2019: Determinación de la dirección del diseño para el nuevo edificio Completada
  • 2019-20: Planificación y preparación para las mudanzas de las escuela Completadas
  • 2019–20: Construcción de la escuela temporal Willard Completada
  • Verano 2020: Edison se traslada al sitio temporal Willard Completado
  • Verano 2020: Trabajo preliminar en la Edison Completado
  • Otoño de 2020: Eliminación del edificio antiguo Completado
  • 2020-22: Construcción del nuevo edificio En progreso
  • 2020–2022: Escuela primaria Edison en Willard Completado
  • Otoño 2022: Se inaugura el nuevo edificio de la Escuela Primaria Edison

Acerca del proyecto 

  • Cronograma: La construcción comenzó en el verano de 2020, la nueva escuela abre en 2022
    • Equipo de arquitectos: Mahlum Architects y Robertson Sherwood Architects
    Contratista general: John Hyland Construction, INC
    • Capacidad: ~450 estudiantes
    • Historia del edificio: La parte original fue construida en 1926

Acerca de la medida del bono escolar

En noviembre de 2018, los votantes del Distrito Escolar de Eugene 4J aprobaron rotundamente una medida de bonos escolares de $319,3 millones para financiar mejoras en cada escuela 4J y reemplazar tres edificios escolares antiguos con instalaciones de alta calidad construidas para la seguridad escolar, la sostenibilidad, los estándares sísmicos modernos y la educación del siglo XXI. Las mejoras incluyen nueva tecnología para estudiantes, materiales de instrucción actualizados, mejoras de accesibilidad y equidad, actualizaciones de seguridad y reparaciones de edificios.

Ahora mismo en el sitio

Imagen actualizada cada 10 minutos

Obtenga más información