Fuller Middle School Building Project
Page Navigation
- About
- Project Overview and Background
- The Feasibility Study
- Frequently Asked Questions (FAQ)
- Massachusetts School Building Authority (MSBA)
- Presentations and Documents
- School Building Committee (SBC)
- Fuller Building Project: In The News
- CM Prequalification Committee
- Trade Contractor Prequalification Committee
- Groundbreaking Ceremony
- OPM AND CM CONSTRUCTION REPORTS
MSBA Submissions
-
The MSBA mandates a rigorous and multi-submission Feasibility Study and approval process and will provide Framingham a grant of up to 62.31% of the study costs and eligible design and construction costs plus incentives. The three submissions are the Preliminary Design Program (PDP), Preferred Schematic Report (PSR), and the Schematic Design. The reports can be accessed by clicking on the links below.
PDP Submissions
- PDP Report
- PDP Appendices
- MSBA Review Comments to the PDP Submission
- District’s Response to MSBA Review Comments to the PDP Submission
PSR Submissions
- Preferred Schematic Report Submission to the MSBA
- MSBA Review Comments to the PSR Submission
- MSBA Review Comments PSR Space Summary Submission
- District’s Response to MSBA Review Comments to the PSR Submission
- MSBA Vote to Approve City of Framingham to Proceed into Schematic Design
Schematic Design Submission
- Schematic Design Drawings
- Schematic Design Project Manual
- Schematic Design Report
- MSBA’s Comments to the Schematic Design Submission
- District’s Response to MSBA Comments to Schematic Design Submission
Design Development Submission of May 17, 2019
- Design Development Report with Appendices
- Design Development Specifications - Volume 1
- Design Development Specifications - Volume 2
- Design Development Drawings - Volume 1
- Design Development Drawings - Volume 2
- MSBA Comments to the Design Development Submission
- District’s Response to MSBA Comments to Design Development Submission
60% Construction Documents Submission of August 9, 2019
- 60% Construction Documents Submission to the MSBA
- 60% Construction Documents Volume 1 Drawings
- 60% Construction Documents Volume 2 Drawings
- 60% Construction Documents Volume 2 Specifications
- MSBA Comments on 60% Construction Documents Submission
- District’s Response to MSBA Comments on 60% Construction Documents Submission
90% Construction Documents Submission of December 12, 2019
- 90% Construction Document Submission to the MSBA
- 90% Construction Documents Volume 1 Drawings
- 90% Construction Documents Volume 2 Drawings
- 90% Construction Documents Volume 1 Specifications
- 90% Construction Documents Volume 2 Specifications
- 90% Construction Documents Volume 3 Specifications
- MSBA Comments on 90% Construction Documents Submission
- District’s Response to MSBA Comments on 90% Construction Documents Submission
Fuller Conformed Set of Specifications and Drawings of February 13, 2020