- Framingham Public Schools
- Project Overview and Background
- The Chosen Design - Folded Hands Plan
Fuller Middle School Building Project
Page Navigation
- About
- Project Overview and Background
- The Feasibility Study
- Frequently Asked Questions (FAQ)
- Massachusetts School Building Authority (MSBA)
- Presentations and Documents
- School Building Committee (SBC)
- Fuller Building Project: In The News
- CM Prequalification Committee
- Trade Contractor Prequalification Committee
- Groundbreaking Ceremony
- OPM AND CM CONSTRUCTION REPORTS
The Chosen Design - Folded Hands Plan
-
The Folded Hands design option offers a new three-story construction with a learning commons/cafeteria at the core surrounded by collaboration balconies fronting a perimeter of classrooms, an 8,300-square-foot gymnasium, 420-seat auditorium, and full-building air conditioning. Additionally, there will be space for Science, Technology, Engineering, Art, and Mathematics (STEAM) instructional areas. No swing space is required during construction which means a lack of neighborhood interference and there will be no need to temporarily move students to an alternative location.
The approximate total project cost is $98.3 Million. The MSBA will provide Framingham a grant of up to 62.31% of the eligible Feasibility Study, design and construction costs, which means the the City’s share after the grant from the MSBA estimated to be $58.8 Million. The approximate average cost per year for the average residential tax payer is estimated to be $101 per year.
To view these images larger, click on the four corners icon between the drawing icon and settings in the gray bar below the images. Click Escape to return to the webpage.