- Framingham Public Schools
- School Building Committee (SBC)
Fuller Middle School Building Project
Page Navigation
- About
- Project Overview and Background
- The Feasibility Study
- Frequently Asked Questions (FAQ)
- Massachusetts School Building Authority (MSBA)
- Presentations and Documents
- School Building Committee (SBC)
- Fuller Building Project: In The News
- CM Prequalification Committee
- Trade Contractor Prequalification Committee
- Groundbreaking Ceremony
- OPM AND CM CONSTRUCTION REPORTS
-
A Framingham School Building Committee (SBC) was established in August 2016 and meets approximately every two weeks. The meetings are open to the public, posted and recorded. The meeting minutes and agendas for each meeting can be accessed on the City of Framingham's website: framinghamma.gov/meetings.
The SBC and MSBA have been working to explore the building options, to refine them based on needs, and on Monday April 30, 2018, they selected the “Folded Hands” as the preferred design for the project. By selecting the design on time, the building committee meets a milestone allowing for the City of Framingham to move forward and submit plans to the Massachusetts School Building Authority (MSBA).
SCHOOL BUILDING COMMITTEE PRESENTATIONS
The presentations available in the links below were made by the architect to the School Building Committee to convey the status of the study and the design options.