Roosevelt Connecting Drive 2018 – Quote Doc
Roosevelt Connecting Drive 2018 – PreQuote Conf. Attendees
Roosevelt Connecting Drive 2018 – Addendum No. 1
Status | Bid Due Date | Mandatory Pre-Bid Date | Non-Mandatory Pre-Bid Date | Addenda | Est. Construction Cost | Category |
---|---|---|---|---|---|---|
Closed | Feb 15, 2018 @ 2:00 p.m. | -- | Jan 31, 2018 @ 10:00 a.m. Roosevelt Middle School 500 E 24th Ave, Eugene, OR | 2 | $60,000 | Construction |