Capital Projects & Facilities 

  • 2006 Bond

    The 2006 $45M Bond accomplished the following:

    MAJOR PROJECTS

    -Bainbridge High School 200 building replacement
    -Maintenance building replacement 
     

    CAPITAL IMPROVEMENTS

    Bainbridge High School
    -(4) Portables purchased to house students during construction of the 200 Building
    -Energy conservation (lighting upgrades)
    •100 Bldg
    -LGI stage area safety improvements
    -HVAC (failing boiler system valve replacement)
    •300 Bldg
    -Conversion and upgrade of 3 science rooms 
    -Laboratory prep room conversion and upgrade
    -Unification to new boiler system-hydronic heat
    •400 Bldg
    -HVAC upgrades – boiler controls
    •500 Bldg
    -Unification to new boiler system/hydronic heat
    -Remediate water infiltration
    -Roof replacement
    •Stadium
    -Roof replacement & exterior paint
    -Track and field replacement
    -Baseball field minor improvements
     

    Commodore Facility

    -Commons/lunchroom and kitchen
    -Music room floor replacement
    -Intercom upgrades
    -Energy conservation (lighting upgrades)
    -Partial roof replacement
    -Partial building demolition
    -Science room renovation
    -Heat recovery unit replacement
     
    Woodward Middle School
    -Energy conservation (lighting upgrades)
    -Connecting pathway to Sakai
     
    Sakai Intermediate School
    -Energy conservation (lighting upgrades)
    -Connecting pathway to Woodward
    -Drainage improvements
    -Intercom upgrades
     
    Blakely Elementary School
    -Energy conservation (lighting upgrades)
    -Domestic hot water system improvement
    -South island sewer connection
    -Seismic improvement to covered play area
    -Gymnasium floor replacement
    -Portable relocation from BHS

    Ordway Elementary School
    -Energy conservation (lighting upgrades)
    -Gymnasium floor replacement
    -Fascia abatement and replacement
    -Bathroom remodels
    -Clock and intercom improvements
    -Interior paint

    Wilkes Elementary School
    -Roof postpone patch & repair

    Capital Projects Districtwide
    -Board room
    -Communications upgrade
    -Minor paving improvements