Swayney

Carpentry 3

  • 1.00 Understand Commercial Drawing (Module 27201-07) 25 B2

    2.00 Apply Cold-Formed Steel Framing Construction Method (Module 27205-07) 15 C3

    3.00 Apply Drywall Installations (Module 27206-07) 15 C3

    4.00 Apply Drywall Finishing Procedures (Module 27207-07) 12.5 C3

    5.00 Apply Doors and Door Hardware Installation (Module 27208-07) 20 C3

    6.00 Apply Windows, Door, Floor and Ceiling Trim Procedures (27210-07)

Last Modified on August 22, 2018