Lincoln Elementary
Project Information
Location: 200 South Sampson Street
Square Footage: Additional approximately 6,000
Classrooms: 21 classrooms K-5 with classrooms for learning specialists
Student Capacity: Approximately 450 students
Funding Source: 2018 Capital Bond Project
Construction Management: OAC Services
Anticipated Completion: Fall, 2022
Project Overview
- Remove portables currently used as classroom space
- Abatement, based upon HazMat report
- Install new elevator
- Construct a new full size gymnasium
- Relocate the cafeteria and kitchen to existing gymnasium location
- Relocate the library and music room to existing cafeteria and kitchen location
- Full mechanical, electrical and plumbing renovation, including fire suppression
- Upgrades to current Washington State energy code
- Additional seismic mitigation, as necessary
- Interior classroom and hallway space renovation
- Additional off-street parking to west of the new gymnasium and in front of the main building, including a drop-off/pick-up loop
The Process Begins
Ellensburg School District is currently in the process of selecting the Design-Builder for the Progressive-Design-Build renovation Lincoln Elementary project. Simultaneously, Integris Architecture is meeting with a committee formed to determine the Education Specifications for Lincoln Elementary comprised of teachers, administrators, and parents.