Due to the construction of our new PK-12 building on the high school/middle school campus, traffic patterns for arrival and dismissal have changed, as well as parking for staff, students and visitors. Another important change is the location of the main driveway off of St. Rt. 226/Shreve Rd., which is now located just south of the previous drive closer to the baseball field. The old driveway is now for construction vehicles only. Please refer to the graphics in the link below for more details of these changes.