skip to main content
Toggle navigation
Home
District
Superintendent
Administration
Approved Contracts
Budget and Voting Information
Chain of Command for Communications
Contact us
Directions
District Email
District Record Database
ESSA
FERPA
Financial Information
General Municipal Law
Kindergarten Registration Information
Legal Notices
Mission Statement
Newsletters/Communications
NYS Parent Dashboard
Universal Pre-K
Security
BOE
Agendas/Minutes
Board of Education
Board of Education Letters
District Health Emergency Plan
District Policy Manual
Live Streamed Meetings
Meeting Schedule
Public Access To Records
Schools
Edward J. Bosti Elementary School
Cherokee Street Elementary School
Helen B. Duffield Elementary School
Idle Hour Elementary School
John Pearl Elementary School
Edith L. Slocum Elementary School
Sycamore Avenue Elementary School
Oakdale-Bohemia Middle School
Ronkonkoma Middle School
Connetquot High School
Departments
Athletics & Physical Education
Business Department
Central Registration
Counseling Department
Curriculum and Instruction
English Language Arts
Fine Arts and Music Education
Libraries
Mathematics & Computer Science K-12
Plant and Facilities
Purchasing
Science, Family & Consumer Sciences, Technology Education
Social Studies
Special Education Department
Technology
Transportation
World Languages/ENL
Staff
Employment
Staff Services
Teacher Center
Google Classroom Instructions
Community
Bohemia Historical Society
Connetquot Cares
Connetquot Public Library
Connetquot SEPTA
Connetquot Youth Association
Connetquot Youth Lacrosse
Connetquot United Soccer Club
Friends of Connetquot
Important Information for Megan's Law
Islip Arts Council
Lake Ronkonkoma Historical Society
No Child Left Behind: A Parent's Guide
Parent Portal Information
Suffolk County Early Voting
Graduation Video Archive
Mental Health
Connetquot Drug and Alcohol Task Force
Mental Health Resources
Calendars
Main Calendar
Connetquot High School
Edith Slocum School
Idle Hour School
John Pearl School
Music
Oakdale-Bohemia Middle School
Ronkonkoma Middle School
Sycamore Avenue School
Board of Education
Cherokee Street School
District
Edward J. Bosti School
Helen B. Duffield School
2023-24 Approved Calendar
2023-24 Printable Calendar
2024-25 Approved Calendar
Project Scope of Work
Edward J. Bosti Elementary School
Refurbishment of Library to create Media Center
Convert existing library into a multi functional media center intended to expand students creativity where they can gain access to information and resources. The term used Is a "shared learning space". This will involve new furniture including flexible seating options, and shelving, ceiling and lighting replacement, replacement of existing flooring, the introduction of new A/C, electrical, demolition, technology a new circulation desk, finishes and carpentry. HVAC units will be located on second floor roof and ductwork will be extended down to first floor to provide cooling to the spaces.
Casework Replacement
The request was made to replace the existing cabinetry and storage cabinets in the existing art room.
Vinyl Asbestos Floor Tile Abatement
Replace all remaining asbestos floor tile and vinyl cove base. Bulk scrape all existing mastic. Furnish and install new vinyl composite tile, 6" rubber cove base. Proper floor prep prior to installing new flooring shall also be required. Work shall be completed in strict accordance with NYSDOL ICR 56.
Asphalt pavement and storm drainage
The existing front bus loop is in need of full depth asphalt replacement and the installation of additional storm water drywells to address constant flooding during periods of heavy rains. Partial replacement of curbing and sidewalk will also be included in this project.
HVAC Reconstruction
Replacement of existing pneumatic controls to DDC at multiple locations throughout the building. This work was not part of the 2014 capital projects.
ADA walkways
Furnish and install new ADA sidewalks to all existing playground areas. Play areas at the East end of the site will receive a new 8'-0" wide sidewalk and the smaller area to the SW corner of the site will receive a new 5'-0" wide sidewalk.
Playgrounds
The request was made to add to existing playground areas to include more structures which can be geared towards the physically challenged. These should include items for sensory development. Additionally replace the existing fibar with new rubberized surface.
HVAC Reconstruction
Provide mechanical fresh air ventilation into student/staff occupied spaces which currently do not meet the requirements of the International Building Code and the NYS Manual of Planning Standards. There are currently 3 spaces on the second floor that do not meet this requirement. Additionally we are recommending the replacement of the remaining Nesbitt UV's that were not replaced as part of the 2014 capital project. Recently installed digital controls will be removed and reinstalled onto new UV's.
Replace Existing underground Electric Service
Replace existing incoming Primary lines from street to existing pad mounted transformer.
Loading Dock Reconstruction
Due to the slope and configuration of the existing loading dock, off loading and deliveries are some what difficult to take place due to the lack of space in and around the area. The recommendation would be to remove the bumpers and railing, and infill the ramp area to bring the ramp up to grade. The railing will be replaced and new bollards will be installed.
Back to the Project Scope of Work Page
w7