Measure A on November Ballot
Clovis Unified’s Measure A is on the ballot this November. Measure A is a facility bond measure that maintains a stable tax rate and would provide for: 
  • Safety, energy efficiency and technology upgrades for ALL schools.
  • Modernization and repairs to aging schools.
  • Completion of our new high school to ease overcrowding.
 
Learn more about this $400M facility bond measure at cusd.com.
7676 N. First Street Fresno, CA 93720  |  (559) 327-2500

Impact of Facility Bonds

Home  \  About  \  Impact of Facility B...

The Impact of Facility Bonds at Our School

2024measurea
GET INFORMED: MEASURE A – 
WHY FUNDS ARE NEEDED TO FINISH CLOVIS SOUTH
It’s your school district. Help decide how Clovis Unified will look in the future. Learn the facts about Measure A and be an informed voter in the November election.
 
FACT: Clovis East High is overcrowded, with 5,000 students on campus this year and growing. In 2020, the community supported building Clovis South High in order to ease overcrowded conditions. Plans and a budget (that included normal inflation) were developed for Clovis South (located on the Terry Bradley Educational Center along with Sanchez Intermediate) before the pandemic. No one could have known that unprecedented post-pandemic inflation in construction costs would create a funding gap, but it did. Now, without Measure A the district cannot finish the high school and other solutions would have to be found to house the thousands of students slated to attend the Clovis South.
 
Learn more about Measure A, the bond that does not increase the current tax rate, at cusd.com.

Safety and Energy Bond Video.mp4   <<<<<<<<CLICK TO WATCH THIS VIDEO

To learn more about the bond, see cusd.com/2024Bond.

Make sure your voice is heard. Mail-in-Ballots are arriving!
 
Clovis Unified’ s Measure A is on the ballot this November. Learn more at cusd.com.

“Maximizing Achievement for All Students,” means making sure that every school, no matter when it was built, is a high-quality learning environment where students can do their best.

Over time, our school has benefited from community support of facility bond measures in many ways, allowing us to continue to have a modern, well-maintained campus equitable to other schools around Clovis Unified.

“What will this school get if Measure A passes this November?” 

Measure A is on the November 2024 ballot. If passed, it will provide our school with:
•Roof Replacement
•Flooring in MPR
•Replace Fencing
•Safety Enhancements
•AV Technology Improvements
•LED Lighting Upgrades
•Add Cluster Office

GET INFORMED: MEASURE A – 
EVERY SCHOOL BENEFITS
It’s your school district. Help us decide how Clovis Unified will look in the years to come. Learn the facts about Measure A and be an informed voter in the November election.
 
FACT:  All Clovis Unified schools would benefit from the bond. Funds would be designated for safety, energy efficiency and technology upgrades at every school campus across the district’s 198-square-mile area. From security window replacements to cameras and lighting, the upgrades would add to the protection of our students and staff.
 
Learn more about Measure A, the bond that does not increase the current tax rate, at https://www.cusd.com/2024bondmeasure.aspx

Since 2012, Kastner Intermediate School has received the following projects funded by two Measure A facility bonds:
  • Renovated pool, decking and equipment
  • Restored baseball field turf and infields
  • Reconfigured space for choir room
  • Repaired and added exterior concrete
  • Replaced roofing on campus
  • Repaired door hardware and casework
  • Upgraded Heating, Ventilation, Air-conditioning (HVAC) system
  • Added lighting efficiency improvements
  • Improved exterior lighting
  • Upgraded technology network and wireless access
  • Upgraded classroom audio-visual systems
  • Added security cameras
  • Replaced plumbing fixtures and upgraded restrooms
  • Repaired and upgraded irrigation system, improved turf condition, drainage on play fields
  • Completed Americans with Disabilities Act (ADA) required upgrades

Every school facility in Clovis Unified has benefited from bond projects not once or twice, but many times over. Across the District, bond funds have been used for:
  • Fixing leaking roofs, electrical wiring, fire safety doors and smoke alarms
  • Repairing and upgrading deteriorating science, engineering and math classrooms to provide modern learning spaces at all of our schools
  • Building new schools and adding space at existing schools to reduce overcrowding
  • Building new performing arts and athletic spaces and upgrading others
  • Making needed updates to facilities to provide safe, clean drinking water
  • Improving school safety and security by updating communication systems and security systems
  • Maintaining equitable facilities at schools of all ages through modernization and maintenance projects
  • And many, many other upgrades and repairs
Many people don’t realize that as of 2024, our community has a lower tax rate on school bonds than it did in 2020, 2010 or even 2000. They also don’t know that Clovis Unified residents pay a lower tax rate than people living in neighboring school districts like Fresno, Sanger and Central. Learn more about our facilities program and the use of facility bonds in Clovis Unified at www.cusd.com/Facilities.aspx
Clovis Unified School District: Be the best you can be in mind, body, and spirit
Buchanan Area Schools
Buchanan link image Alta Sierra link image Cole link image Century Elem logo with "C" and Tiger Dry Creek link image Garfield Elementary Logo Tarpey link image Woods link image
Clovis High Area Schools
Clovis High link image Clark link image Cedar Wood link image Clovis Elementary link image Mickey Cox link image Gettysburg link image Jefferson link image Red Bank link image Sierra Vista link image Weldon link image
Clovis West Area Schools
Clovis West link image Kastner link image Ft. Washington link image Liberty link image Lincoln link image Maple Creek Nelson link image Pinedale link image Valley Oak link image
Clovis North Area Schools
Clovis North link image Bud Rank link image Copper Hills Fugman link image Mountain View link image River View link image
Clovis East Area Schools
Clovis East wolf logo Freedom link image Miramonte link image Oraze link image Reagan Elementary link image
Clovis South Area Schools
TBEC Logo Boris Chargers logo Fancher Creek Logo Hirayama Logo TK Logo Young logo
Educational Services Area Schools
CART link image Gateway link image Clovis Online School link image Clovis Community Day School link image Clovis Adult Education link image Sierra Outdoor link image
View text-based website