- Centennial School District 28J
- 2020 Bond
2020 Bond
-
On May 19, 2020, voters in the Centennial School District approved a $65 million bond, requiring a tax rate of $1.19 per $1000 of assessed property value for bond repayment. Find the ballot measure language here.
Since the measure was approved, the school district received a matching grant of $7,464,690 from the state. A simple majority was required for the approval of Measure 26-208. The school district will have paid off older bond obligations before these bonds are issued. This means that the property tax to repay the bonds will not increase the existing rate of $1.19 per $1000 of assessed property value.
Background: Proposed Bond Projects
-
The Centennial School District 28J proposed the following projects to be funded by the bond:
- re-purpose Oliver Elementary School as a middle school;
- build gymnasiums for Meadows, Parklane, Patrick Lynch, and Powell Butte Elementary Schools;
- repair roofing;
- repave school parking lots;
- update drainage systems; and
- modernize heating units.
Visit Our 2020 Bond Updates Blog!
-
Continue along with the progress of our 2020 bond projects at www.csd28j.org/2020bondupdates.
Projects for Each School
-
Click on each of the schools below to see what projects are taking place thanks to the community's support of the 2020 Bond.
-
Butler Creek Elementary
- Exterior painting
- Safety and security upgrades (cameras, intrusion alarms, IT infrastructure)
- Minor roof repairs
- Mechanical repairs
-
Centennial High School
- The wood floors in the Centennial High School main gym were stripped, sanded, repaired, sealed, and striped. The striping included a large center Eagles logo.
- $2 Million worth of roof repairs
- Six new tennis courts
- Mechanical system and controls improvements
- Expanded safety & security systems (access controls, cameras, intrusion alarms, IT infrastructure)
- Pool repairs (pool deck, pool shell, pool plumbing system)
- Drainage improvements
- New flooring in locker rooms
-
Centennial Middle School
- Extensive roof repairs
- Corridor updates including floor tile removal and the polishing of concrete floors and wainscot wall protection
- New paint on upper walls and doors
- Extensive ceiling repairs
- Ventilation and mechanical improvements
- All three gym floors were completely stripped, sanded, sealed, and striped
- Resurfaced track and field event areas
- Improved storm drainage around the track and at the center of the field to minimize standing water
- Science labs and media center renovations
- Locker room updates
- Improved safety and security (security vestibule, intercom, cameras, intrusion alarms, IT infrastructure)
- Replacing lighting with energy efficient lighting in science classrooms, media center, and all corridors
-
Meadows Elementary
- New, dedicated 7000 square foot gymnasium facility
- Drainage improvements
- Extensive roof repairs
- Window repairs
- Safety and security (security vestibule, cameras, intrusion alarms, IT infrastructure, fire alarm system)
- Floor tile removal and polishing of concrete floors in corridors and the cafeteria
- Expanded playground equipment
- Mechanical improvements
- New lighting throughout the school
-
Oliver
- Track replacement
- Resurface field event areas
- Improved storm drainage around the track and in the center field to minimize standing water, and irrigation added in the center of the field to improve playability and maintenance
- Extensive roof repair and replacement
- Seismic improvements
- Corridor improvements: Floor tiling removed; concrete floors polished; wall coverings, wainscott and painting of upper walls and doors; ceilings repaired
- The upper gym floor completely stripped, sanded, sealed, and striped
- Ventilation and mechanical improvements
- New science labs and media center renovations
- New career technical improvements
- Safety and security updates (fire alarm, security vestibule and front office renovation, intercom, cameras, intrusion alarms, IT infrastructure)
- Mechanical improvements
- Replacing lighting with energy efficient lighting in science classrooms, media center, and all corridors
- Solar paneling
- Middle school furnishing
-
Parklane Elementary
- New, dedicated 7,000 square foot gymnasium facility
- Exterior painting
- Extensive roof repairs
- Safety and security updates (fire alarm system, cameras, intrusion alarms, IT infrastructure)
- Mechanical improvements
- New lighting throughout the school
- Floor tile removal and polishing of concrete floors in corridors and the cafeteria
-
Patrick Lynch Elementary
- New, dedicated 7,000 square foot gymnasium facility
- Drainage improvements
- Extensive roof repairs
- Mechanical improvements
- Safety and security updates (security vestibule, fire alarm, intercom, cameras, intrusion alarms, IT infrastructure)
- New lighting throughout the school
- Floor tile removal and polishing of concrete floors in corridors and the cafeteria
- Expanded playground equipment
-
Pleasant Valley Elementary
- New flooring throughout the building in many classrooms, the front office spaces, and the media center.
- $2.5M Seismic upgrades to the school original building
- Storm drainage system replacement
- Safety and security (Security vestibule, intercom, cameras, intrusion alarms, IT infrastructure)
- New lighting throughout the school
- Mechanical repairs
- Extensive roof repairs
- Exterior door repairs
- Refurbished gym floor
-
Powell Butte Elementary
- New, dedicated 7,000 square foot gymnasium facility
- Drainage improvements
- New lighting throughout the school
- Extensive roof repairs
- New covered play area
- Safety and security (Security vestibule, fire alarm system, intercom, cameras, intrusion alarms, IT infrastructure)
- Mechanical repairs
- Floor tile removal and polishing of concrete floors in corridors and the cafeteria