| Site 130-E-SE-2Elementary | New/Relief | Construction | 2025 | |
| Windermere HSHigh | Replacement | Construction | 2024 | |
| Dr. Phillips HSHigh | Capital Renewal | Construction | 2024 | |
| Catalina ESElementary | Capital Renewal | Construction | 2023 | |
| Castle Creek ESElementary | Capital Renewal | Construction | 2023 | |
| Avalon MSMiddle/K-8 | Capital Renewal | Construction | 2023 | |
| Arbor Ridge K-8Middle/K-8 | Capital Renewal | Construction | 2023 | |
| Glenridge MSMiddle/K-8 | Capital Renewal | Closeout | 2022 | |
| Edgewater HSHigh | Capital Renewal | Closeout | 2022 | |
| Lawton Chiles ESElementary | Capital Renewal | Closeout | 2022 | |
| Piedmont Lakes MSMiddle/K-8 | Capital Renewal | Closeout | 2022 | |
| Discovery MSMiddle/K-8 | Capital Renewal | Closeout | 2022 | |
| OTC - EAST CAMPUS (Site 512-T-E-1)Vocational/Other | Replacement | Construction | 2024 | |
| Howard MSMiddle/K-8 | Comprehensive Renovation | Construction | 2025 | |
| Lawton Chiles ESElementary | Comprehensive Renovation | Planning | 2026 | |
| Oak Ridge HSHigh | Comprehensive Renovation | Design | 2025 | |
| Westridge MSMiddle/K-8 | Comprehensive Renovation | Design | 2025 | |
| Hunter's Creek MSMiddle/K-8 | Comprehensive Renovation | Design | 2025 | |
| College Park MSMiddle/K-8 | Comprehensive Renovation | Design | 2025 | |
| Whispering Oak ESElementary | Comprehensive Renovation | Design | 2025 | |
| Hunter's Creek ESElementary | Comprehensive Renovation | Design | 2025 | |
| Dr. Phillips ESElementary | Comprehensive Renovation | Design | 2025 | |
| Endeavor ESElementary | Comprehensive Renovation | Design | 2026 | |
| Citrus ESElementary | Comprehensive Renovation | Design | 2026 | |
| Camelot ESElementary | Comprehensive Renovation | Design | 2026 | |
| Avalon ESElementary | Comprehensive Renovation | Design | 2026 | |
| Timber Creek HSHigh | Comprehensive Renovation | Planning | 2027 | |
| Palmetto ESElementary | Comprehensive Renovation | Planning | 2026 | |
| Olympia HSHigh | Comprehensive Renovation | Planning | 2027 | |
| Ocoee MSMiddle/K-8 | Comprehensive Renovation | Planning | 2025 | |
| Oakshire ESElementary | Comprehensive Renovation | Planning | 2026 | |
| Northlake Park ESElementary | Comprehensive Renovation | Construction | 2026 | |
| Chain of Lakes MS Middle/K-8 | Comprehensive Renovation | Planning | 2026 | |
| Boone HighHigh | Comprehensive Renovation | Planning | 2027 | |
| Site 97-E-SE-2 Greenfield SchoolElementary | New/Relief | Construction | 2025 | |
| Luminary Middle School (Site 129-M-SE-2)Middle/K-8 | New/Relief | Construction | 2024 | |
| Lakemont ESElementary | Capital Renewal | Planning | 2023 | |
| OTC - Apopka Campus (Site 204-AE-N-7)Vocational/Other | Capital Renewal | Design | 2022 | |
| Atwater Bay Elementary (Site 47-E-W-4)Elementary | New/Relief | Construction | 2024 | |
| Three Points ESElementary | Comprehensive Renovation | Design | 2025 | |
| Lakeview MSMiddle/K-8 | Comprehensive Renovation | Design | 2026 | |
| Howard MSMiddle/K-8 | Comprehensive Renovation | Design | 2024 | |
| Windy Ridge SchoolMiddle/K-8 | Capital Renewal | Planning | 2023 | |
| Washington Shores PLCVocational/Other | Capital Renewal | Design | 2022 | |
| Union Park MSMiddle/K-8 | Capital Renewal | Planning | 2023 | |
| Tildenville ESElementary | Capital Renewal | Planning | 2024 | |
| Lockhart MSMiddle/K-8 | Capital Renewal | Planning | 2023 | |
| Legacy MSMiddle/K-8 | Capital Renewal | Design | 2023 | |
| Dr. Phillips HSHigh | Capital Renewal | Design | 2022 | |
| Apopka HSHigh | Capital Renewal | Planning | 2023 | |
| Innovation High School (Site 50-H-SE-2)High | New/Relief | Construction | 2024 | |
| Hungerford ES (OTC - Eatonville)Vocational/Other | Comprehensive Renovation | Construction | 2023 | |
| Apopka 9th Grade CenterHigh | Capital Renewal | Complete | 2021 | |
| Andover ESElementary | Capital Renewal | Design | 2023 | |
| OTC - South Campus (Formerly Mid-Florida Tech)Vocational/Other | Comprehensive Renovation | Design | 2025 | |
| Thornebrooke ESElementary | Capital Renewal | Design | 2022 | |
| Ocoee HSHigh | Capital Renewal | Planning | 2023 | |
| Hillcrest ESElementary | Comprehensive Renovation | Complete | 2018 | |
| Hidden Oaks ESElementary | Replacement | Complete | 2018 | |
| Union Park ESElementary | Comprehensive Renovation | Complete | 2018 | |
| Maxey ESElementary | Replacement | Complete | 2018 | |
| Hungerford ESElementary | Replacement | Complete | 2018 | |
| Sally Ride ESElementary | Comprehensive Renovation | Complete | 2018 | |
| Dover Shores ESElementary | Comprehensive Renovation | Complete | 2018 | |
| Pine Hills ESElementary | Replacement | Complete | 2018 | |
| Frangus ESElementary | Replacement | Complete | 2018 | |
| Lake Como SchoolMiddle/K-8 | Replacement | Complete | 2018 | |
| Audubon ParkMiddle/K-8 | New/Relief | Complete | 2018 | |
| Ivey Lane ESElementary | Replacement | Complete | 2017 | |
| Oak Hill ESElementary | Replacement | Complete | 2017 | |
| Rock Lake ESElementary | Replacement | Complete | 2017 | |
| Meadow Woods ESElementary | Replacement | Complete | 2017 | |
| Mollie Ray ESElementary | Replacement | Complete | 2017 | |
| Engelwood ESElementary | Replacement | Complete | 2017 | |
| Carver MSMiddle/K-8 | Replacement | Complete | 2017 | |
| Laureate Park ESElementary | New/Relief | Complete | 2017 | |
| OCPS Academic Center for Excellence (ACE)Middle/K-8 | New/Relief | Complete | 2017 | |
| Windermere HSHigh | New/Relief | Complete | 2017 | |
| Innovation MSMiddle/K-8 | New/Relief | Complete | 2017 | |
| Timber Springs MSMiddle/K-8 | New/Relief | Complete | 2017 | |
| Westpointe ESElementary | New/Relief | Complete | 2017 | |
| Ventura ESElementary | Replacement | Complete | 2016 | |
| Lockhart ESElementary | Capital Renewal | Complete | 2016 | |
| Dream Lake ESElementary | Comprehensive Renovation | Complete | 2016 | |
| Riverside ESElementary | Comprehensive Renovation | Complete | 2016 | |
| Tangelo Park ESElementary | Replacement | Complete | 2016 | |
| Wedgefield SchoolElementary | New/Relief | Complete | 2016 | |
| Bay Lake ESElementary | New/Relief | Complete | 2016 | |
| Millennia Gardens ESElementary | New/Relief | Complete | 2016 | |
| Independence ESElementary | New/Relief | Complete | 2015 | |
| Eagle Creek ESElementary | New/Relief | Complete | 2015 | |
| Apopka ESElementary | Comprehensive Renovation | Complete | 2015 | |
| Clay Springs ESElementary | Replacement | Complete | 2015 | |
| Lake Whitney ESElementary | Comprehensive Renovation | Complete | 2015 | |
| Lake Weston ESElementary | Replacement | Complete | 2015 | |
| Dr. Phillips HSHigh | Comprehensive Renovation | Complete | 2015 | |
| Lovell ESElementary | Replacement | Complete | 2015 | |
| Pineloch ESElementary | Capital Renewal | Complete | 2014 | |
| John Young ESElementary | Replacement | Complete | 2014 | |
| Ocoee ESElementary | Replacement | Complete | 2014 | |
| Rosemont ESElementary | Capital Renewal | Planning | 2023 | |
| Lake Sybelia ESElementary | Capital Renewal | Planning | 2021 | |
| Glenridge MSMiddle/K-8 | Capital Renewal | Construction | 2021 | |
| Colonial HSHigh | Comprehensive Renovation | Design | 2026 | |
| Piedmont Lakes MSMiddle/K-8 | Capital Renewal | Planning | 2023 | |
| Panther Lake ElementaryElementary | New/Relief | Construction | 2022 | |
| Water Spring MSMiddle/K-8 | New/Relief | Construction | 2023 | |
| OTC - East Campus (Site 512-T-E-1) Formerly Winter Park CampusVocational/Other | Replacement | Design | 2024 | |
| Shingle Creek ESElementary | Replacement | Complete | 2014 | |
| Waterford ESElementary | Comprehensive Renovation | Complete | 2014 | |
| Wheatley ESElementary | Replacement | Complete | 2014 | |
| Little River ESElementary | Replacement | Complete | 2014 | |
| Dr. Phillips ESElementary | Replacement | Complete | 2014 | |
| Washington Shores ESElementary | Replacement | Complete | 2014 | |
| Spring Lake ESElementary | Replacement | Complete | 2014 | |
| Lake Silver ESElementary | Comprehensive Renovation | Complete | 2014 | |
| Eccleston ESElementary | Replacement | Complete | 2013 | |
| Sun Blaze ESElementary | New/Relief | Complete | 2013 | |
| Prairie Lake ESElementary | New/Relief | Complete | 2013 | |
| Brookshire ESElementary | Replacement | Complete | 2013 | |
| Arbor Ridge K-8Middle/K-8 | Replacement | Complete | 2013 | |
| Rock Springs ESElementary | Comprehensive Renovation | Complete | 2013 | |
| Lancaster ESElementary | Replacement | Complete | 2013 | |
| Oak Ridge HSHigh | Replacement | Complete | 2013 | |
| Westridge MSMiddle/K-8 | Replacement | Complete | 2013 | |
| SunRidge MSMiddle/K-8 | New/Relief | Complete | 2012 | |
| SunRidge ESElementary | New/Relief | Complete | 2012 | |
| Zellwood ESElementary | Comprehensive Renovation | Complete | 2012 | |
| Princeton ESElementary | Comprehensive Renovation | Complete | 2012 | |
| Cypress Springs ESElementary | Comprehensive Renovation | Complete | 2012 | |
| Aloma ESElementary | Comprehensive Renovation | Complete | 2012 | |
| University HSHigh | Comprehensive Renovation | Complete | 2012 | |
| Walker MSMiddle/K-8 | Comprehensive Renovation | Complete | 2012 | |
| Evans HSHigh | Replacement | Complete | 2012 | |
| Orange Center ESElementary | Comprehensive Renovation | Design | 2023 | |
| Winter Park 9th Grade CenterHigh | Comprehensive Renovation | Complete | 2011 | |
| Wetherbee ESElementary | New/Relief | Complete | 2011 | |
| Waterbridge ESElementary | Comprehensive Renovation | Complete | 2011 | |
| Southwood ESElementary | Comprehensive Renovation | Complete | 2011 | |
| Rosemont ESElementary | Comprehensive Renovation | Complete | 2011 | |
| Metrowest ESElementary | Comprehensive Renovation | Complete | 2011 | |
| Lake Sybelia ESElementary | Comprehensive Renovation | Complete | 2011 | |
| Edgewater HSHigh | Comprehensive Renovation | Complete | 2011 | |
| Chickasaw ESElementary | Comprehensive Renovation | Complete | 2011 | |
| Azalea Park ESElementary | Comprehensive Renovation | Complete | 2011 | |
| Apopka MSMiddle/K-8 | Comprehensive Renovation | Complete | 2011 | |
| Riverdale ESElementary | Comprehensive Renovation | Complete | 2010 | |
| Pinewood ESElementary | Comprehensive Renovation | Complete | 2010 | |
| Piedmont Lakes MSMiddle/K-8 | Comprehensive Renovation | Complete | 2010 | |
| Palm Lake ESElementary | Comprehensive Renovation | Complete | 2010 | |
| Forsyth Woods ESElementary | New/Relief | Complete | 2010 | |
| Maitland MSMiddle/K-8 | Comprehensive Renovation | Complete | 2010 | |
| Lockhart MSMiddle/K-8 | Comprehensive Renovation | Complete | 2010 | |
| College Park MS Middle/K-8 | Comprehensive Renovation | Complete | 2010 | |
| Lakeville ESElementary | Comprehensive Renovation | Complete | 2010 | |
| Hunter's Creek MSMiddle/K-8 | Comprehensive Renovation | Complete | 2010 | |
| Gotha MSMiddle/K-8 | Comprehensive Renovation | Complete | 2010 | |
| Dommerich ESElementary | Replacement | Complete | 2010 | |
| Conway MSMiddle/K-8 | Comprehensive Renovation | Complete | 2010 | |
| Apopka HSHigh | Replacement | Complete | 2009 | |
| West Orange HSHigh | Replacement | Complete | 2009 | |
| Robinswood MSMiddle/K-8 | Comprehensive Renovation | Complete | 2009 | |
| Memorial MSMiddle/K-8 | Replacement | Complete | 2009 | |
| Lake Nona HSHigh | New/Relief | Complete | 2009 | |
| Keene's Crossing ESElementary | New/Relief | Complete | 2009 | |
| East River HSHigh | New/Relief | Complete | 2009 | |
| Discovery MSMiddle/K-8 | Comprehensive Renovation | Complete | 2009 | |
| Union Park MSMiddle/K-8 | Comprehensive Renovation | Complete | 2008 | |
| Westbrooke ESElementary | New/Relief | Complete | 2008 | |
| Timber Lakes ESElementary | New/Relief | Complete | 2008 | |
| Shenandoah ESElementary | Comprehensive Renovation | Complete | 2008 | |
| Lakemont ESElementary | Replacement | Complete | 2008 | |
| Killarney ESElementary | Comprehensive Renovation | Complete | 2008 | |
| Conway ESElementary | Replacement | Complete | 2008 | |
| Windermere ESElementary | Comprehensive Renovation | Complete | 2007 | |
| Wekiva HSHigh | New/Relief | Complete | 2007 | |
| Sunset Park ESElementary | New/Relief | Complete | 2007 | |
| Sadler ESElementary | Comprehensive Renovation | Complete | 2007 | |
| Riverside ESElementary | Replacement | Complete | 2007 | |
| Princeton ESElementary | Comprehensive Renovation | Complete | 2007 | |
| Olympia HSHigh | Comprehensive Renovation | Complete | 2007 | |
| Moss Park ESElementary | New/Relief | Complete | 2007 | |
| Liberty MSMiddle/K-8 | Comprehensive Renovation | Complete | 2007 | |
| Roberto Clemente MS (former Jackson MS)Middle/K-8 | Comprehensive Renovation | Complete | 2007 | |
| Columbia ESElementary | Replacement | Complete | 2007 | |
| Chickasaw ESElementary | Replacement | Complete | 2007 | |
| Catalina ESElementary | Replacement | Complete | 2007 | |
| Bridgewater MSMiddle/K-8 | New/Relief | Complete | 2007 | |
| Bonneville ESElementary | Comprehensive Renovation | Complete | 2007 | |
| Baldwin Park ESElementary | New/Relief | Complete | 2007 | |
| Avalon Center for Technical ExcellenceVocational/Other | New/Relief | Complete | 2007 | |
| Apopka ESElementary | Replacement | Complete | 2007 | |
| Wyndham Lakes ESElementary | New/Relief | Complete | 2006 | |
| Wolf Lake MSMiddle/K-8 | New/Relief | Complete | 2006 | |
| Wolf Lake ESElementary | New/Relief | Complete | 2006 | |
| Winter Park HSHigh | Comprehensive Renovation | Complete | 2006 | |
| Windy Ridge K-8Middle/K-8 | Comprehensive Renovation | Complete | 2006 | |
| Vista Lakes ESElementary | New/Relief | Complete | 2006 | |
| Sand Lake ESElementary | New/Relief | Complete | 2005 | |
| Ocoee HSHigh | New/Relief | Complete | 2005 | |
| McCoy ESElementary | Replacement | Complete | 2005 | |
| Legacy MSMiddle/K-8 | New/Relief | Complete | 2005 | |
| Lakeview MSMiddle/K-8 | Comprehensive Renovation | Complete | 2005 | |
| Jones HSHigh | Comprehensive Renovation | Complete | 2005 | |
| Freedom MSMiddle/K-8 | New/Relief | Complete | 2005 | |
| Three Points ESElementary | New/Relief | Complete | 2001 | |
| Timber Creek HSHigh | New/Relief | Complete | 2001 | |
| Olympia HSHigh | New/Relief | Complete | 2001 | |
| Tildenville ESElementary | Comprehensive Renovation | Complete | 2006 | |
| Stone Lakes ESElementary | New/Relief | Complete | 2006 | |
| Southwest MSMiddle/K-8 | Comprehensive Renovation | Complete | 2006 | |
| South Creek MSMiddle/K-8 | New/Relief | Complete | 2006 | |
| Ridgewood Park ESElementary | Comprehensive Renovation | Complete | 2006 | |
| Millennia ESElementary | New/Relief | Complete | 2006 | |
| Meadowbrook MSMiddle/K-8 | Replacement | Complete | 2006 | |
| Colonial Ninth Grade CenterHigh | Comprehensive Renovation | Complete | 2006 | |
| Cheney ESElementary | Replacement | Complete | 2006 | |
| Castle Creek ESElementary | New/Relief | Complete | 2006 | |
| Bay Meadows ESElementary | Comprehensive Renovation | Complete | 2006 | |
| Avalon MSMiddle/K-8 | New/Relief | Complete | 2006 | |
| Whispering Oak ESElementary | New/Relief | Complete | 2005 | |
| East Lake ESElementary | New/Relief | Complete | 2005 | |
| Andover ESElementary | New/Relief | Complete | 2005 | |
| West Oaks ESElementary | New/Relief | Complete | 2004 | |
| West Creek ESElementary | New/Relief | Complete | 2004 | |
| Orlo Vista ESElementary | Replacement | Complete | 2004 | |
| Dillard Street ESElementary | Replacement | Complete | 2004 | |
| Boone HSHigh | Comprehensive Renovation | Complete | 2004 | |
| Hiawassee ESElementary | Replacement | Complete | 2003 | |
| Glenridge MSMiddle/K-8 | Replacement | Complete | 2003 | |
| Freedom HSHigh | New/Relief | Complete | 2003 | |
| Eagle's Nest ESElementary | New/Relief | Complete | 2003 | |
| Colonial HSHigh | Comprehensive Renovation | Complete | 2003 | |
| Thornebrooke ESElementary | New/Relief | Complete | 2002 | |
| Acceleration EastHigh | New/Relief | Complete | 2002 | |
| Positive Pathways Transition CenterVocational/Other | New/Relief | Complete | 2002 | |
| Blankner SchoolMiddle/K-8 | Replacement | Complete | 2002 | |
| Odyssey MSMiddle/K-8 | New/Relief | Complete | 2001 | |
| Ocoee MSMiddle/K-8 | Replacement | Complete | 2001 | |
| Howard MSMiddle/K-8 | Comprehensive Renovation | Complete | 2001 | |
| Camelot ESElementary | New/Relief | Complete | 2001 | |
| Avalon ESElementary | New/Relief | Complete | 2001 | |
| Palmetto Elementary AdditionElementary | New/Relief | Complete | 2000 | |
| Endeavor ESElementary | New/Relief | Complete | 2000 | |
| Citrus ESElementary | New/Relief | Complete | 2000 | |
| Oakshire ESElementary | New/Relief | Complete | 1999 | |
| Northlake Park Community SchoolElementary | New/Relief | Complete | 1999 | |
| Lawton Chiles ESElementary | New/Relief | Complete | 1999 | |
| Metrowest Primary Learning CenterElementary | New/Relief | Complete | 1999 | |
| Chain of Lakes MSMiddle/K-8 | New/Relief | Complete | 1999 | |
| Wolf Lake ESElementary | Capital Renewal | Complete | 2018 | |
| Winter Park HSHigh | Capital Renewal | Complete | 2017 | |
| Southwood ESElementary | Capital Renewal | Complete | 2019 | |
| Odyssey MS Middle/K-8 | Capital Renewal | Complete | 2017 | |
| Odyssey MSMiddle/K-8 | Capital Renewal | Complete | 2019 | |
| Ocoee MSMiddle/K-8 | Capital Renewal | Closeout | 2022 | |
| Northlake Park Community SchoolElementary | Capital Renewal | Complete | 2020 | |
| Liberty MSMiddle/K-8 | Capital Renewal | Closeout | 2022 | |
| Lawton Chiles ESElementary | Capital Renewal | Complete | 2020 | |
| Lakeview MSMiddle/K-8 | Capital Renewal | Construction | 2022 | |
| Roberto Clemente MS (former Jackson MS)Middle/K-8 | Capital Renewal | Design | 2023 |
|
| Colonial HSHigh | Capital Renewal | Complete | 2019 | |
| College Park MSMiddle/K-8 | Capital Renewal | Complete | 2018 | |
| Citrus ESElementary | Capital Renewal | Complete | 2018 | |
| Chain of Lakes MSMiddle/K-8 | Capital Renewal | Construction | 2022 | |
| Boone HSHigh | Capital Renewal | Closeout | 2022 | |
| Blankner SchoolMiddle/K-8 | Capital Renewal | Construction | 2021 | |
| Timber Creek HSHigh | Capital Renewal | Complete | 2022 |
|
| Pinewood ESElementary | Capital Renewal | Complete | 2020 | |
| Olympia HSHigh | Capital Renewal | Complete | 2020 | |
| Oakshire ESElementary | Capital Renewal | Complete | 2020 | |
| Jones HSHigh | Capital Renewal | Construction | 2022 | |
| Gotha MSMiddle/K-8 | Capital Renewal | Complete | 2020 | |
| Discovery MSMiddle/K-8 | Capital Renewal | Complete | 2021 | |
| Colonial Ninth Grade CenterHigh | Capital Renewal | Complete | 2020 | |
| Acceleration EastHigh | Capital Renewal | Closeout | 2021 | |
| Wolf Lake MSMiddle/K-8 | Capital Renewal | Closeout | 2022 |
|
| Riverdale ESElementary | Capital Renewal | Complete | 2020 | |
| Ridgewood Park ESElementary | Capital Renewal | Complete | 2020 | |
| Lakeville ESElementary | Capital Renewal | Complete | 2020 | |
| Freedom HSHigh | Capital Renewal | Complete | 2020 | |
| Boone HSHigh | Capital Renewal | Complete | 2020 | |
| Bonneville ESElementary | Capital Renewal | Design | 2023 | |
| Winter Park HSHigh | Comprehensive Renovation | Design | 2026 | |
| Ventura ESElementary | Replacement | Complete | 2017 | |
| Water Spring ESElementary | New/Relief | Complete | 2019 | |
| Union Park ESElementary | Comprehensive Renovation | Complete | 2018 | |
| Timber Springs MSElementary | New/Relief | Complete | 2017 | |
| Sunrise ESElementary | Comprehensive Renovation | Complete | 2019 | |
| Sally Ride ESElementary | Comprehensive Renovation | Complete | 2018 | |
| Pine Hills ESElementary | Replacement | Complete | 2018 | |
| Pershing SchoolMiddle/K-8 | Replacement | Complete | 2019 | |
| OCPS Academic Center for ExcellenceMiddle/K-8 | New/Relief | Complete | 2017 | |
| Maxey ESElementary | Replacement | Complete | 2018 | |
| Lake George ESElementary | Comprehensive Renovation | Complete | 2019 | |
| Lake Gem ESElementary | Comprehensive Renovation | Complete | 2019 | |
| Lake Como SchoolMiddle/K-8 | Replacement | Complete | 2018 | |
| Hungerford ESElementary | Replacement | Complete | 2018 | |
| Horizon West MSMiddle/K-8 | New/Relief | Complete | 2019 | |
| Hidden Oaks ESElementary | Replacement | Complete | 2018 | |
| Frangus ESElementary | Replacement | Complete | 2018 | |
| Dover Shores ES Elementary | Comprehensive Renovation | Complete | 2018 | |
| Deerwood ESElementary | Replacement | Complete | 2019 | |
| Corner Lake MSMiddle/K-8 | Comprehensive Renovation | Complete | 2019 | |
| Castleview ESElementary | New/Relief | Complete | 2019 | |
| Boone HSHigh | Replacement | Complete | 2019 | |
| Audubon Park SchoolMiddle/K-8 | New/Relief | Complete | 2018 | |
| Pine Hills Transportation CenterVocational/Other | Comprehensive Renovation | Complete | 2019 | |
| Colonial HSHigh | Replacement | Complete | 2019 | |
| Winegard ESElementary | Replacement | Complete | 2020 | |
| Southwest MSMiddle/K-8 | Comprehensive Renovation | Complete | 2020 | |
| Rolling Hills ESElementary | Replacement | Complete | 2020 | |
| Pinar ESElementary | Replacement | Complete | 2020 | |
| Magnolia School/Silver Pines Academy K-12 Learning CenterVocational/Other | Replacement | Closeout | 2021 | |
| Boone HSHigh | Replacement | Complete | 2020 | |
| Acceleration WestHigh | Comprehensive Renovation | Complete | 2020 | |
| Boone HSHigh | Comprehensive Renovation | Complete | 2020 | |
| Hamlin MSMiddle/K-8 | New/Relief | Construction | 2022 | |
| Kelly Park SchoolMiddle/K-8 | New/Relief | Construction | 2022 | |
| Meadow Woods MSMiddle/K-8 | Comprehensive Renovation | Closeout | 2021 | |
| Orange Technical College (Formerly OTC - Orlando)Vocational/Other | Comprehensive Renovation | Construction | 2023 | |
| OTC West Campus (Site 73-T-W-7) Formerly Westside TechVocational/Other | Replacement | Construction | 2024 | |
| Village Park ESElementary | New/Relief | Closeout | 2021 | |
| Hamlin ESElementary | New/Relief | Construction | 2022 | |
| Stonewyck ElementaryElementary | New/Relief | Construction | 2022 | |
| Horizon HSHigh | New/Relief | Closeout | 2021 | |
| Lake Buena Vista HSHigh | New/Relief | Closeout | 2021 |
|
| Summerlake ESElementary | New/Relief | Complete | 2020 | |
| Vista Pointe ESElementary | New/Relief | Closeout | 2020 |
|
| Sunshine ESElementary | New/Relief | Closeout | 2020 |
|